Initial import from bf-network-r6.opencode — opencode migration
This commit is contained in:
21
README.md
Normal file
21
README.md
Normal file
@@ -0,0 +1,21 @@
|
||||
# bf-network-r6
|
||||
|
||||
BF-Netzwerk-Migration (Variante R6+C2). 2× MikroTik hAP ax² + Core ALL-SG8316M.
|
||||
|
||||
**SSOT & Übergabe:** [`HANDOVER.md`](HANDOVER.md) — kompletter Status, Architektur + Begründungen, Phasen, Gotchas, Zugänge.
|
||||
|
||||
**Plan-Origin:** ~/.claude/plans/welche-kosteng-nstigen-alternativen-zu-memoized-sparkle.md
|
||||
|
||||
**Struktur:**
|
||||
- `docs/vlan-plan.md` — VLAN-/Adressplan (final)
|
||||
- `docs/core-switch-prep.md` — Core-Switch Status & Phasen
|
||||
- `docs/firmware-flash-runbook.md` — FW-Flash Historie
|
||||
- `switch/cli/CLI-REFERENCE.md` — bestätigte CLI-Syntax
|
||||
- `switch/cli/*.cli` / `*.exp` — reproduzierbare Konfig-Scripts
|
||||
- `inventory/bf.csv` / `bf.md` — IP-Doku (aus IPs.xlsx gespiegelt)
|
||||
- `inventory/bf-core-ports.csv` / `.md` — Switch-Port-Map
|
||||
|
||||
**Aktueller Stand (2026-06-09):**
|
||||
- Phase A (VLAN-Vorbereitung) ✅ abgeschlossen
|
||||
- Phase B (hAP-Cutover) ⏳ wartet auf MikroTik-Lieferung
|
||||
- Phase C (Firewall) + Phase D (Adress-Migration) ausstehend
|
||||
Reference in New Issue
Block a user